Ball Mill Equipment Operation

  • 1. Pre-prepared:
    a)Clean up debris around the mill impeding the operation, checking safety facilities are completed properly.
    b)Check whether there has been a dangerous location in the machine!
    c)Check the ground surface to the grate plate center distance (that checks fill rate) whether it is in line with requirements;
    d)Check anchor bolts, liner bolts, cylinder bolts connected with the hollow shaft, large gear connected whether there is loosening bolts, if loose should be tightened;
    e)Solid manhole cover will be secured tightly.
    f)The lubricants must be filled .
    2. Boot sequence:
    a)Starting out conveying equipment;
    b)Activate the mill. (If no prior material exists within the mill, then starting the same time as starting feed mill equipment)
    3 Parking order
    a)To stop the feed mill equipment;
    b)Stop grinding;
    c)Stop discharging conveying equipment.
    4. Handling Precautions
    a)After the mill stops, turn the mill semi-circle every 5-10 minutes, until the mill is cool, in order to prevent generating too high a temperature stress on shaft of endcovers.
    b)Always check the adequacy of the bearing lubricant;
    c)If there is a long time of stop, balls should be poured out to prevent the deforming of the cylinder.